Product details
Our door guardrail provides 2 kinds of installation methods
1. No punching installation
2. Drilling installation
Please choose the right installation method according to your wall:
1. No-punch installation suitable for walls: Wood, Metal, Glass, Tile wall
2. Suitable wall for perforated installation: all walls
Please be careful about these tips before you install the baby gate
- Please don't install it on the wet place, wallpaper, fabric, concrete, and uneven surface if you choose the punch-free installation.
- Keep press for 30 seconds for every baseplate to make it more sturdy.
- Wait for 24 hours to use it after installing.
- The minimum width requires for punch-free installation is 3.2 inches (8cm).
- Please install it as close to the ground as possible
- Please don't install it on the DRYWALL whichever installation method you choose.